Optimized flowshop scheduling of multiple production lines for precast production

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
52
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 92 publications
(53 citation statements)
references
References 16 publications
0
52
0
1
Order By: Relevance
“…It is also necessary to emphasize the importance of information interoperability between resource planning systems of different supply chain bodies [75]. One of the most common risk factors is late delivery due to inconsistent logistics information caused by human error [76]. Successful supply chain strategic research and project evaluation contribute to stakeholders grasping market opportunities and challenges, reducing total cost, improving construction efficiency, seizing the construction market, and further winning development.…”
Section: Risk Evaluationmentioning
confidence: 99%
“…It is also necessary to emphasize the importance of information interoperability between resource planning systems of different supply chain bodies [75]. One of the most common risk factors is late delivery due to inconsistent logistics information caused by human error [76]. Successful supply chain strategic research and project evaluation contribute to stakeholders grasping market opportunities and challenges, reducing total cost, improving construction efficiency, seizing the construction market, and further winning development.…”
Section: Risk Evaluationmentioning
confidence: 99%
“…In general, scheduling is crucial for the production of precast components (precast production for short hereafter), which consists of master production scheduling, material requirement planning and shop floor scheduling. Among them, shop floor scheduling is the most detailed and difficult one, in which production tasks are assigned to specific workshop sections, teams or even operators (Yang et al, 2016).…”
Section: Introductionmentioning
confidence: 99%
“…There are two basic types of precast component production systems in a precast plant, namely, the fixed location production/stationary system and the flow shop production/traveling system [19][20][21]. For fixed location production, all the activities are performed in a particular workstation either by the same team or different teams.…”
Section: Problem Descriptionmentioning
confidence: 99%
“…Prata et al proposed a model based on integer linear programming to schedule the production of the beams so as to minimize the losses in a minimal time by taking into account the constraints inherent in the forms and beams [18]. Yang et al proposed a flow shop scheduling model of multiple production lines for precast production and developed an optimization approach to facilitate optimized scheduling by using genetic algorithm [19].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation