Optimization of Tower Crane Location and Material Quantity Between Supply and Demand Points: A Comparative Study

Abstract: Location optimization of tower crane as an expensive equipment in the construction projects has an important effect on material transportation costs. Due to the construction site conditions, there are several tower crane location optimization models. Appropriate location of tower cranes for material supply and engineering demands is a combinatorial optimization problem within the tower crane layout problem that is difficult to resolve.  Meta-heuristics are popular and useful techniques to resolve complex optim… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 14 publications
(12 citation statements)
references
References 24 publications
0
12
0
Order By: Relevance
“…Therefore, the effect of the outrigger position on seismic demand is determined to find the optimal position. Different optimization methods can be used in solving engineering problems [57][58][59][60][61][62][63].…”
Section: Dynamic Analysismentioning
confidence: 99%
“…Therefore, the effect of the outrigger position on seismic demand is determined to find the optimal position. Different optimization methods can be used in solving engineering problems [57][58][59][60][61][62][63].…”
Section: Dynamic Analysismentioning
confidence: 99%
“…During the last few decades, researchers have been obsessed with finding the best method to address problems related to the Construction Engineering Optimization Problems (CEOPs) [14]. Since the main function of tower cranes are for transporting bulky construction materials [15], and also material transportation is a complex activity during the building construction process; thus, hoisting and lifting bulky materials needs meticulous planning [16]. As a result, during the last twenty years, TCLP is applied as a method to find out the best possible location for supply points and tower cranes within a building construction site to enable to meet minimum time objectives efficiently and effectively.…”
Section: Tower Crane Selection and Layout Problemmentioning
confidence: 99%
“…In the process of proper tower crane selection and optimal layout of the tower crane and supply yard, the crane has to meet the capacity related constraints Eqs. (15) and (16). Whereby during the travel of materials from supply yard to the demand points the load moment across the jib must be less than the maximum load moment capacity (Eq.…”
Section: Capacity Constraintsmentioning
confidence: 99%
See 1 more Smart Citation
“…The use of Tower Crane (Kaveh & Vazirinia, 2018) for small cities in Indonesia with a project budget of under 10 billion rupiahs, is very inefficient, the costs of mobilization and demobilization are very high (Hartono et al, 2018). What's more the existence of the project in the regency cities located in small islands.…”
Section: Introductionmentioning
confidence: 99%