Optimization of Prefabricated Components in Housing Modular Construction

Abstract: In modular construction—a type of industrialized construction—production planning is very important, as it is closely related to the project’s duration, quality, and sustainability. The constraints (production area, delivery due date) often differ for each project, yet production planning in modular construction has failed to change with the project characteristics. As a result, bottlenecks and construction delays are common problems seen in modular construction, which, in turn, decreases the production ratio,… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 23 publications
(9 citation statements)
references
References 32 publications
0
9
0
Order By: Relevance
“…(2) SO with metaheuristics requires the call of the simulation model frequently to evaluate the fitness of each individual solution of the population in each iteration. (3) Finding the optimum values of the controllable parameters for each metaheuristic requires extensive numerical experiments. (4) Construction researchers tend to hybridize DES with other simulation approaches such as system dynamics [46] or integrate it with neural networks [47].…”
Section: Literature Review Of Simulation-optimization (So) In the Con...mentioning
confidence: 99%
See 3 more Smart Citations
“…(2) SO with metaheuristics requires the call of the simulation model frequently to evaluate the fitness of each individual solution of the population in each iteration. (3) Finding the optimum values of the controllable parameters for each metaheuristic requires extensive numerical experiments. (4) Construction researchers tend to hybridize DES with other simulation approaches such as system dynamics [46] or integrate it with neural networks [47].…”
Section: Literature Review Of Simulation-optimization (So) In the Con...mentioning
confidence: 99%
“…Regarding the project's cost (TPC), Equation (3) shows that it equals the sum of the direct (DC) and indirect costs (IC). Equation (4) shows that the indirect costs include the overheads (CIC) and the mobilization and demobilization costs (MC) of each piece of equipment and human resource used in the production, logistics and installation processes.…”
Section: Objective Functions and Constraintsmentioning
confidence: 99%
See 2 more Smart Citations
“…Bottlenecks and construction delays are common problems due to inefficient construction site production. Prefabricated components can reduce bottlenecks, improve production rates, and shorten production times (6). In addition, weather does not have significant negative impacts on prefabricated construction assembly and this effectively ensures construction efficiency (7).…”
Section: Introductionmentioning
confidence: 99%