Optimization of Distributed Integrated Multi-energy System Considering Industrial Process Based on Energy Hub

Abstract: As a typical scenario of distributed integrated multi-energy system (DIMS), industrial park contains complex production constraints and strong associations between industrial productions and energy demands. The industrial production process (IPP) consists of controllable subtasks and strict timing constraints. Taking IPP as a control variable of optimal scheduling, it is an available approach that models the IPP as material flow into an extension energy hub (EH) to achieve the optimization of industrial park. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(8 citation statements)
references
References 23 publications
0
8
0
Order By: Relevance
“…The topologies of the two subsystems are depicted in Figures 3 and 4. Three EHs were connected to electric buses 3,4,5,10,12,16,20,26, and 29 in the electrical system and the natural gas nodes 2, 8, 10, 13, 14, 19, 21, 31, and 40 in the natural gas system. The coupling relationship inside the IES is shown in Figure 5.…”
Section: System Descriptionmentioning
confidence: 99%
See 1 more Smart Citation
“…The topologies of the two subsystems are depicted in Figures 3 and 4. Three EHs were connected to electric buses 3,4,5,10,12,16,20,26, and 29 in the electrical system and the natural gas nodes 2, 8, 10, 13, 14, 19, 21, 31, and 40 in the natural gas system. The coupling relationship inside the IES is shown in Figure 5.…”
Section: System Descriptionmentioning
confidence: 99%
“…The modeling of the energy hub (EH) and its internal components is one of the key points in current research on day-ahead optimal energy flow. In [5], taking the industrial production process (IPP) as a control variable of optimal scheduling, a universal extension EH model was proposed. The results demonstrate that such a method reduces the operation cost.…”
Section: Introductionmentioning
confidence: 99%
“…Industrial parks have complex production constraints, and the types of energy required for different production links are also distinct. There is a corresponding coupling relationship between the industrial production process and the IES [31]. Power plants supply electricity, natural gas and heat energy to various types of loads, and the energy conversion process mostly involves the cascade utilization of heat [32].…”
Section: Necessity Analysis Of Iess Constructionmentioning
confidence: 99%
“…To put forward a novel optimal scheduling method, an extension energy hub (EH) model considering the industrial production process was formulated in Ref. [7]. The method can improve the energy efficiency and reduce the cost of industrial park DIMS.…”
Section: Introductionmentioning
confidence: 99%