Optimisation of production planning for an innovative hybrid underground mining method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7
2

Relationship

2
7

Authors

Journals

citations
Cited by 17 publications
(7 citation statements)
references
References 12 publications
0
7
0
Order By: Relevance
“…Little et al [20] showed the value of optimizing the shape of the stope by providing a model to optimize the shape of the two stopes. Mousavi and Sellers [21] integrated in mine recovery (IMR) into conventional mining operations, which can significantly increase the net present value of the project by recycling low-grade material from conventional mining that is commonly left as waste rock. Campeau and Gamache [22] proposed an optimization model for short-term planning, taking into account the various working points from the development and production phases, as well as the specific equipment and worker restrictions using a mixed integer program with priority.…”
Section: Relevant Literature 21 Short-term Resource Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…Little et al [20] showed the value of optimizing the shape of the stope by providing a model to optimize the shape of the two stopes. Mousavi and Sellers [21] integrated in mine recovery (IMR) into conventional mining operations, which can significantly increase the net present value of the project by recycling low-grade material from conventional mining that is commonly left as waste rock. Campeau and Gamache [22] proposed an optimization model for short-term planning, taking into account the various working points from the development and production phases, as well as the specific equipment and worker restrictions using a mixed integer program with priority.…”
Section: Relevant Literature 21 Short-term Resource Planningmentioning
confidence: 99%
“…Constraint (19) determines the volume of ore and waste scheduled to be mined during each shift based on the number of shift hours in the plan period determined by the short-term planning period. Constraints (20) and (21) require that the total number of round trips of the scrapers or electric locomotives on each line be equal.…”
Section: Constraintsmentioning
confidence: 99%
“…High energy blasting creates the fragmentation and the operation becomes a series of dump leach reactors in sealed chambers with modern, improved chemical/biological based methods being employed to recover the valuable mineral. The methods require updated blasting practices and mine sequence optimisation (Mousavi & Sellers 2019). Alternatively, for a more automated, remote operational approach, the inline recovery (ILR) concept incorporates selective mining and ore upgrading in modular underground sizing and processing plants, such that only concentrated material is transported to the processing facility, significantly reducing the material movement to the surface.…”
Section: Solving Current Problems With Data Fusionmentioning
confidence: 99%
“…Large-scale gangue movement and treatment drive operating costs and set higher cut-off grades that require the mining methods to produce in an economy of scale (Hartman & Mutmansky 2002;Hustrulid et al 2013). To address the large footprint of current methods, novel mining methods have been proposed (Mining3 2017; Mousavi & Sellers 2019;Rossien 2018;USBM 1994). The main consideration required for transformational methods are encapsulated into methods that have reduced operational costs, zero-entry, invisible mining that leaves waste in place, and reduces ore movement and processing.…”
Section: Introductionmentioning
confidence: 99%