2021
DOI: 10.3390/met11111848
|View full text |Cite
|
Sign up to set email alerts
|

Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning

Abstract: The working environment of underground mines is complicated, making it difficult to construct an underground mine production plan. In response to the requirements for the preparation of a short-term production plan for underground mines, an optimization model for short-term resource planning was constructed, with the goal of maximizing the total revenue during the planning period. The artificial bee colony optimization algorithm is used to solve the model using MATLAB. According to the basic requirements of un… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…The findings of this study can further the goal of green and efficient mining and provide a theoretical reference for the popularization and application of pillarless sublevel caving with large structural parameters at home and abroad. The case study of the dispatch optimization model for haulage equipment between stopes based on mine short-term resource planning carried out by Li et al [4] constructed an optimization model for shortterm resource planning to maximize the total revenue during the planning period. Results show that, based on the improved optimization algorithm, using short-term production planning schemes to guide mine production operations can increase the haulage equipment utilization rate, thereby increasing mine production revenue.…”
Section: Contributionsmentioning
confidence: 99%
“…The findings of this study can further the goal of green and efficient mining and provide a theoretical reference for the popularization and application of pillarless sublevel caving with large structural parameters at home and abroad. The case study of the dispatch optimization model for haulage equipment between stopes based on mine short-term resource planning carried out by Li et al [4] constructed an optimization model for shortterm resource planning to maximize the total revenue during the planning period. Results show that, based on the improved optimization algorithm, using short-term production planning schemes to guide mine production operations can increase the haulage equipment utilization rate, thereby increasing mine production revenue.…”
Section: Contributionsmentioning
confidence: 99%