2002
DOI: 10.1109/mper.2002.4312439
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Vegetation Maintenance Scheduling of Overhead Electric Power Distribution Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
18
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 14 publications
(19 citation statements)
references
References 0 publications
1
18
0
Order By: Relevance
“…Trees near distribution lines are usually managed by trimming, and other management activities include the application of tree-growth regulators, the application of herbicides, and tree-removal and replacement programs (Kuntz et al, 2002). The North American Electric Reliability Corporation has enforced the applicable transmission owners to follow the vegetation management standards (NERC, 2012).…”
Section: Resilience Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…Trees near distribution lines are usually managed by trimming, and other management activities include the application of tree-growth regulators, the application of herbicides, and tree-removal and replacement programs (Kuntz et al, 2002). The North American Electric Reliability Corporation has enforced the applicable transmission owners to follow the vegetation management standards (NERC, 2012).…”
Section: Resilience Planningmentioning
confidence: 99%
“…Establishing a fixed-time interval schedule based on tree growth and weather studies is a traditional method for vegetation management (Dai and Christie, 1994). Kuntz et al (2002) derived an optimal vegetation management scheduling for distribution systems by proposing a maintenance-scheduling algorithm that can determine when and where to perform vegetation management.…”
Section: Resilience Planningmentioning
confidence: 99%
“…• Vegetation management: this is done by trimming the trees around transmission and distribution lines to minimize the airborne debris that touching the lines and cause a short circuit and to avoid trees falling into the poles or lines [81][82][83].…”
Section: Improving Physical Durabilitymentioning
confidence: 99%
“…Several studies on RCM have confirmed significant reductions in maintenance cost or even enhanced system availability. As regards the power system field, RCM application to transmission and distribution systems has been studied for a few years [2,3].…”
Section: Introductionmentioning
confidence: 99%
“…The second model is identical to the first model with the exception that the failure rate is not constant [2]. This model also provides the optimal maintenance interval as in the first model.…”
Section: Introductionmentioning
confidence: 99%