2017 7th International Conference on Power Systems (ICPS) 2017
DOI: 10.1109/icpes.2017.8387362
|View full text |Cite
|
Sign up to set email alerts
|

Optimal tie line placement of distribution system incorporating performance based rates

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 20 publications
0
2
0
Order By: Relevance
“…Ex-ante payment for quality regulation is used in Germany [46]. Distribution planning considering reliability evaluation and PBR is conducted in [60][61][62]. The quality of network and quality of the consumed services are typically important for consumers, but not necessarily to the same extent.…”
Section: Service Quality Regulationmentioning
confidence: 99%
“…Ex-ante payment for quality regulation is used in Germany [46]. Distribution planning considering reliability evaluation and PBR is conducted in [60][61][62]. The quality of network and quality of the consumed services are typically important for consumers, but not necessarily to the same extent.…”
Section: Service Quality Regulationmentioning
confidence: 99%
“…A multi-stage and multiload-scenario active distribution network expansion planning model was proposed, which considered the applications of new distributed generation and construction of feeders at the planning level (Shen et al, 2018), and maximum TSC can be achieved by planning feeder links. In the study by Verma and Swarup (2017), the optimal feeder link placement problem was solved by focusing on the minimization of penalties incurred by the distribution network, and optimal feeder link location was found by a fundamental loop-based algorithm. The length upper limit estimation method for the optimal planning scheme feeder link is proposed to considerably reduce the search range of the optimal feeder link planning scheme (Hou et al, 2019).…”
Section: Introductionmentioning
confidence: 99%