Optimal Placement of TCSC for Congestion Management and Power Loss Reduction Using Multi-Objective Genetic Algorithm

Abstract: Electricity demand has been growing due to the increase in the world population and higher energy usage per capita as compared to the past. As a result, various methods have been proposed to increase the efficiency of power systems in terms of mitigating congestion and minimizing power losses. Power grids operating limitations result in congestion that specifies the final capacity of the system, which decreases the conventional power capabilities between coverage areas. Flexible AC Transmission Systems (FACTS)… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
29
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
8
1

Relationship

3
6

Authors

Journals

citations
Cited by 46 publications
(29 citation statements)
references
References 36 publications
0
29
0
Order By: Relevance
“…Singh, et.al [26] offered mixed integer linear programming (MILP) to find the optimal settings and locations of Thyristors Control Phase Shifter (TCPST). Nguyen, et.al [27] designed MINLP approach for the optimal appointment of TCSC in the power system. Mahad, et.…”
Section: B Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Singh, et.al [26] offered mixed integer linear programming (MILP) to find the optimal settings and locations of Thyristors Control Phase Shifter (TCPST). Nguyen, et.al [27] designed MINLP approach for the optimal appointment of TCSC in the power system. Mahad, et.…”
Section: B Literature Reviewmentioning
confidence: 99%
“…Content may change prior to final publication. The crossponding fitness and average points can be expressed in Eq (27) and (28), given as follows. = ( )…”
Section: A Coventional Lapo Algorithmmentioning
confidence: 99%
“…Figure 1 shows the static of a TCSC connected between bus and [20,21]. The power flow equations from bus to bus , including TCSC, are as follows [21]:…”
Section: Tcsc Modelingmentioning
confidence: 99%
“…Power systems require the balance between the generated and consumed power for the stable voltage and frequency in power systems [38][39][40][41][42][43]. The power generation of all hydropower plants and thermal power plants, and power consumed by load and lines must follow the equality below:…”
Section: Constraints Of Power Systemsmentioning
confidence: 99%