Optimal micro-PMU placement and virtualization for distribution network changing topologies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 38 publications
0
3
0
Order By: Relevance
“…At transmission system, the running cost is lower to development cost because of voltage transformer and expensive current. 38 But in the distribution network, CT and Voltage transformer (VT) transducers are not accurately needs a high reporting rate. 39 Therefore, these above factors are very important to choose PMU and total system monitoring cost may be expressed as,…”
Section: Monitoring System Costmentioning
confidence: 99%
See 2 more Smart Citations
“…At transmission system, the running cost is lower to development cost because of voltage transformer and expensive current. 38 But in the distribution network, CT and Voltage transformer (VT) transducers are not accurately needs a high reporting rate. 39 Therefore, these above factors are very important to choose PMU and total system monitoring cost may be expressed as,…”
Section: Monitoring System Costmentioning
confidence: 99%
“…In these figs there are totally 2 μ-PMUs are located in IEEE-13 bus-system nodes, such as 2 and 7. And 12 μ-PMUs are placed at the nodes of IEEE-34 bus systems, such as 02, 10,14,20,24,34,40,38,54,88, 64, and 46.…”
Section: Placement Of 𝛍-Pmus In Different Busesmentioning
confidence: 99%
See 1 more Smart Citation