2011
DOI: 10.1016/j.rser.2011.07.008
|View full text |Cite
|
Sign up to set email alerts
|

Optimal installation of small hydropower plant—A review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
39
0
1

Year Published

2012
2012
2023
2023

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 95 publications
(40 citation statements)
references
References 34 publications
0
39
0
1
Order By: Relevance
“…Many researchers have suggested that micro hydro is one of the most environmentally benign energy conversion options available because it does not interfere significantly with river flows (Fraenkel et al, 1991;Mishra et al, 2011). Yet environmental managers in the UK see microhydro power as a massive contemporary issue (Cussens, Natural England, pers.…”
Section: Bringing In the Socio-environmental Dimension: Fluvial Procementioning
confidence: 99%
“…Many researchers have suggested that micro hydro is one of the most environmentally benign energy conversion options available because it does not interfere significantly with river flows (Fraenkel et al, 1991;Mishra et al, 2011). Yet environmental managers in the UK see microhydro power as a massive contemporary issue (Cussens, Natural England, pers.…”
Section: Bringing In the Socio-environmental Dimension: Fluvial Procementioning
confidence: 99%
“…Furthermore, a World Bank study in 2006 showed that pico-hydropower is the most competitive offgrid power technology on a levelized cost of electricity (LCOE) basis ($/kWh), as shown in Fig. 1 [3,4]. In Rwanda for example, the national utility retail price for electricity in 2009 was $0.24/kWh [5], yet pico-hydro is estimated to cost less than $0.20/kWh.…”
Section: Introductionmentioning
confidence: 99%
“…As the life period of battery bank and inverter are shorter than PV system; the replacement cost of the wind turbine, the batteries and the inverter have to be included in the cost analysis of the power system [11][12][13][14].…”
Section: B the Replacement Costmentioning
confidence: 99%