Mechanics of Offshore Pipelines : Volume I 2023
DOI: 10.1016/b978-0-12-816859-2.00004-7
|View full text |Cite
|
Sign up to set email alerts
|

Offshore Facilities and Pipeline Installation Methods

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 47 publications
0
0
0
Order By: Relevance
“…The S-lay process sees the pipeline transition from a horizontal vessel position, curving downwards to the seabed in an emblematic S-shape. In contrast, the J-lay method, preferred for deeper waters, deploys the pipeline from a vertical lay system (VLS) tower, assuming a J-shape [15].…”
Section: Introductionmentioning
confidence: 99%
“…The S-lay process sees the pipeline transition from a horizontal vessel position, curving downwards to the seabed in an emblematic S-shape. In contrast, the J-lay method, preferred for deeper waters, deploys the pipeline from a vertical lay system (VLS) tower, assuming a J-shape [15].…”
Section: Introductionmentioning
confidence: 99%