Objective-driven and Pareto Front analysis: Optimizing time, cost, and job-site movements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 21 publications
(13 citation statements)
references
References 31 publications
0
11
0
Order By: Relevance
“…For example, Chen et al (2018) incorporated cloud computing and BIM to enable the real-time collection, communication and visualization of information across the processes of production, transportation and on-site assembly for prefabricated construction. Planning and design can be highly integrated with the construction phase through BIM adoption, especially in IPD. Keywords including communication, optimization, algorithm and constructability were found highly connected to planning and design, indicating that BIM had large potential in assisting project planning, optimize construction activities, as well as enhancing the communication among project participants (Faghihi et al , 2016; Jian, 2017). Keywords including visualization, construction safety, scheduling, 4D and construction planning were found strongly connected to each other within the same cluster.…”
Section: Results Of Scientometric Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…For example, Chen et al (2018) incorporated cloud computing and BIM to enable the real-time collection, communication and visualization of information across the processes of production, transportation and on-site assembly for prefabricated construction. Planning and design can be highly integrated with the construction phase through BIM adoption, especially in IPD. Keywords including communication, optimization, algorithm and constructability were found highly connected to planning and design, indicating that BIM had large potential in assisting project planning, optimize construction activities, as well as enhancing the communication among project participants (Faghihi et al , 2016; Jian, 2017). Keywords including visualization, construction safety, scheduling, 4D and construction planning were found strongly connected to each other within the same cluster.…”
Section: Results Of Scientometric Analysismentioning
confidence: 99%
“…Planning and design can be highly integrated with the construction phase through BIM adoption, especially in IPD. Keywords including communication, optimization, algorithm and constructability were found highly connected to planning and design, indicating that BIM had large potential in assisting project planning, optimize construction activities, as well as enhancing the communication among project participants (Faghihi et al , 2016; Jian, 2017).…”
Section: Results Of Scientometric Analysismentioning
confidence: 99%
“…A great improvement in performance and productivity has been achieved through the application of Concurrent Engineering where all life cycle stages of a product are considered simultaneously, from the conceptual stage through to the detailed design stage (Love and Gunasekaran, 1997). Pareto analysis is an effective lean tool which is successfully used in optimizing time, cost, hazards and job-site movements in construction project (Faghihi et al , 2016). McAdam et al (2000) stated that the company which adopted a culture of Continuous Improvement could provide with a solid foundation on which it can build a culture of effective business innovation and effective management system.…”
Section: Lean Principles In Constructionmentioning
confidence: 99%
“…The research category "construction and project management" (RC6) is the most trending BIM sub-field (with 78 articles) among the ten identified research categories, and it also has the highest number of research areas with 18 themes as seen in Tables 5 and 6. Trending topics in this field include RC6.1 -"construction planning and monitoring" (Faghihi et al 2016;Kim et al 2014; RC6.2 -"schedule optimization" (Altaf et al 2014;Chen et al 2013;Faghihi et al 2014;Gelisen, Griffis 2014;Kang et al 2016;Liu et al 2015a;Moon et al 2014;Tserng et al 2014;Wang et al 2014a); RC6.3 -"BIM governance platform" (Dossick, Neff 2010;Farr et al 2014;Knight 2008); RC6.4 -"Material management & quality assessment" (Chen, Luo 2014;Francom, El Asmar 2015;Kim et al 2015e), and RC6.5 -"Waste management" (Akinade et al 2015;Liu et al 2015c;Porwal, Hewage 2012;.…”
Section: Construction and Project Management (Rc6)mentioning