2019
DOI: 10.1049/iet-gtd.2019.0204
|View full text |Cite
|
Sign up to set email alerts
|

Non‐linear hybrid approach for the scheduling of merchant underground pumped hydro energy storage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 35 publications
0
6
0
Order By: Relevance
“…The latter need to be in operation to provide reserves due to their minimum power level for ensuring the stability of the hydraulic machines. 40 Overall, these results highlight that sizing decisions can be driven by extreme scenarios, and depend thus on the risk-aversion of the investor.…”
Section: Robustness Of the Solutionmentioning
confidence: 83%
See 1 more Smart Citation
“…The latter need to be in operation to provide reserves due to their minimum power level for ensuring the stability of the hydraulic machines. 40 Overall, these results highlight that sizing decisions can be driven by extreme scenarios, and depend thus on the risk-aversion of the investor.…”
Section: Robustness Of the Solutionmentioning
confidence: 83%
“…This ability to offer upward reserve when the unit is at zero‐power (which occurs during most periods of the second day) is a strong advantage in comparison with pumped‐storage hydro units. The latter need to be in operation to provide reserves due to their minimum power level for ensuring the stability of the hydraulic machines 40 …”
Section: Case Studymentioning
confidence: 99%
“…Revenue from ancillary services for merchant-owned ES were considered in several studies for optimal scheduling [14]- [16]. One study included ancillary services for the scheduling of underground pumped hydro energy storage, considering the unique geometry and physical characteristics of the facility [14]. Another study scheduled ES for energy, reserve, and balancing with an objective to maximize profit [16].…”
Section: A Literature Reviewmentioning
confidence: 99%
“…In our reference setting, we study a 250 MW -1200 MWh merchant storage unit competing in a power system inspired by the Belgian case [58]. The scheduling horizon is one day and the temporal resolution is one hour.…”
Section: Case Studymentioning
confidence: 99%