“…For both GES and ByES, the round-trip efficiency (one complete cycle of charging and discharging) depends on many aspects, such as the velocity, shape and electrical equipment used. However, based on the values stated in [7,16,18,30], 0.83 is used as round-trip efficiency for both GES and ByES. For the transmission losses in the power cables, a typical value of 0.975 used for short-distance (1-2km) inter-array three-core MVAC cables in the offshore wind industry [31] is adopted in this work.…”