2001
DOI: 10.1007/3-540-44691-5_20
|View full text |Cite
|
Sign up to set email alerts
|

New Algorithms for Examination Timetabling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
37
0
1

Year Published

2001
2001
2011
2011

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 69 publications
(38 citation statements)
references
References 12 publications
0
37
0
1
Order By: Relevance
“…Our approach is better than Di Gaspero and Schaerf (2001) for eight problem instances (car91, hec92 I, kfu93, lse91, sta83 I, tre92, ute92, uta92 I), Caramia et al (2001) for four problem instances (car91, car92, sta83 I, tre92), Paquete and Stuetzle (2002) for three problem instances (kfu93, lse91, ute92) and a tie with tre92 and (sta83 I) and Eley (2007) (car91) for one problem instance. Only two approaches (Caramia et al (2001) and Eley (2007)) provided results for pur93 and only three approaches (Caramia et al (2001), Merlot et al (2003) and Eley (2007)) provided result for rye93 while, Paquete and Stuetzle (2002) did not provide any result for car91, car92 and also for uta92 I. Caramia et al (2001), (3) Paquete and Stuetzle (2002), (4) , (5) Merlot et al (2003), (6) Eley (2007), (7) Best obtained using heuristic combinations for δ = 3 and n = 3) (The bold entries indicate the best results).…”
Section: Comparison To the Previous Improvement Approachesmentioning
confidence: 89%
See 2 more Smart Citations
“…Our approach is better than Di Gaspero and Schaerf (2001) for eight problem instances (car91, hec92 I, kfu93, lse91, sta83 I, tre92, ute92, uta92 I), Caramia et al (2001) for four problem instances (car91, car92, sta83 I, tre92), Paquete and Stuetzle (2002) for three problem instances (kfu93, lse91, ute92) and a tie with tre92 and (sta83 I) and Eley (2007) (car91) for one problem instance. Only two approaches (Caramia et al (2001) and Eley (2007)) provided results for pur93 and only three approaches (Caramia et al (2001), Merlot et al (2003) and Eley (2007)) provided result for rye93 while, Paquete and Stuetzle (2002) did not provide any result for car91, car92 and also for uta92 I. Caramia et al (2001), (3) Paquete and Stuetzle (2002), (4) , (5) Merlot et al (2003), (6) Eley (2007), (7) Best obtained using heuristic combinations for δ = 3 and n = 3) (The bold entries indicate the best results).…”
Section: Comparison To the Previous Improvement Approachesmentioning
confidence: 89%
“…These approaches usually consist of multiple phases that first attempts to construct a feasible solution before proceeding with the improvement phases. Caramia et al (2001) proposed a multi phase local search algorithms that starts with a greedy scheduler to create a feasible timetable. A penalty-decreaser and penalty-trader then were used to improve the solution quality.…”
Section: Comparison To the Previous Improvement Approachesmentioning
confidence: 99%
See 1 more Smart Citation
“…Different higher level heuristics/techniques employed within a hyper-heuristic framework include Case Based Reasoning 25 , choice functions 31 and meta-heuristic methods 32,33 . Many of the current state of the art approaches in exam timetabling employ specially tailored heuristic/meta-heuristics methods 20,22,[34][35][36][37][38][39] . This kind of approach is also typical for other scheduling problems.…”
Section: Timetabling Problemsmentioning
confidence: 99%
“…Table 2 also presents the current best published results on these benchmarks by 8 other approaches reported in the literature 20,22,[34][35][36][37][38][39] . The best results are presented in bold.…”
Section: Experiments On Real-world Problemsmentioning
confidence: 99%