IABSE Symposium, Nantes 2018: Tomorrow’s Megastructures 2018
DOI: 10.2749/nantes.2018.s17-33
|View full text |Cite
|
Sign up to set email alerts
|

New Accelerated Prefab Bridge Scheme – the NRW Bridge Modules

Abstract: <p>Arup had been commissioned with the design of a new modular bridge system by Straßen.NRW, the road authority of Germany’s biggest state North Rhine-Westphalia. This article describes the background of this pilot project, the design concept, as well as the structural design and construction sequence of two new bridges, which can be erected within 8-10 weeks. The design is characterized by a high degree of prefabrication, modularity as well as the use of high performance concrete to ensure an excellent … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance