2013
DOI: 10.1007/s12667-013-0078-0
|View full text |Cite
|
Sign up to set email alerts
|

Network constraints in techno-economic energy system models: towards more accurate modeling of power flows in long-term energy system models

Abstract: Power systems are subject to extensive structural changes as a result of the fact that the share of renewable energies in power supply will increase significantly within the next decades. This requires the transport of large amounts of electricity, e.g. from the North Sea to the large load centres. Moreover, the decentralized installations for the generation of electricity (e.g. PV) need to be integrated in the lower voltage power grids without violating net-safety constraints. As a consequence, the grid load … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 20 publications
(16 citation statements)
references
References 18 publications
0
16
0
Order By: Relevance
“…Also technological classifications can be made for different voltage levels or objectives of grid operation (e.g., transmission or distribution). Regarding mathematical models, resolutions range from detailed, nonlinear AC-power flow over decoupled and linear DC-power flow to simple transshipment or transport models [50].…”
Section: Technological Aggregationmentioning
confidence: 99%
“…Also technological classifications can be made for different voltage levels or objectives of grid operation (e.g., transmission or distribution). Regarding mathematical models, resolutions range from detailed, nonlinear AC-power flow over decoupled and linear DC-power flow to simple transshipment or transport models [50].…”
Section: Technological Aggregationmentioning
confidence: 99%
“…These balancing and technical restrictions are complemented by equations regarding the transmission grid [20], which is represented in the model by 560 transmission lines that connect all power stations and grid nodes. Each neighbouring country is depict via one grid node through which the electricity exchange to and from Germany can be set.…”
Section: Processmentioning
confidence: 99%
“…However, even so that it is a linear optimization model with only 46 timeslots representing a year the computing time of the model is still as long as a few days [19]. Furthermore, the growing feed-in of volatile renewable electricity leads to the need for a more detailed time structure and/or a better representation of the electricity grid [20], which would drastically increase computing time.…”
Section: Processmentioning
confidence: 99%
“…national) energy system analyses (e.g. [407][408][409]). However, at the regional and municipal scale, as demonstrated by this review, they are typically not included.…”
Section: 21)mentioning
confidence: 99%