Carbon Management Technology Conference 2012
DOI: 10.7122/150377-ms
|View full text |Cite
|
Sign up to set email alerts
|

NEMS-CTS: A Model and Framework for Comprehensive Assessment of CCS and Infrastructure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…These assumed costs are different from one another because different assumptions are made to address the previously discussed complexity and uncertainty around CCS representation. Some of these assumptions include: using cost and capacity relationships that were estimated independent from one another (Lenox et al, 2013;Victor et al, 2018); using cost estimates made for specific locations to represent the cost of CO 2 transportation and geologic storage over entire regions (Zelek et al, 2012;National Energy Technology Laboratory, 2019); or assuming a CO 2 pipeline of constant length and diameter for a given power plant type to estimate CO 2 transportation cost (Electric Power Research Institute, 2020). Further, these are single-cost relationships for a given area (e.g., state, region) even though supply curves are the typical way cost-capacity relationships are defined for a given resource in energy system planning tools.…”
Section: Introduction Motivation Literature Review and Research Gapsmentioning
confidence: 99%
“…These assumed costs are different from one another because different assumptions are made to address the previously discussed complexity and uncertainty around CCS representation. Some of these assumptions include: using cost and capacity relationships that were estimated independent from one another (Lenox et al, 2013;Victor et al, 2018); using cost estimates made for specific locations to represent the cost of CO 2 transportation and geologic storage over entire regions (Zelek et al, 2012;National Energy Technology Laboratory, 2019); or assuming a CO 2 pipeline of constant length and diameter for a given power plant type to estimate CO 2 transportation cost (Electric Power Research Institute, 2020). Further, these are single-cost relationships for a given area (e.g., state, region) even though supply curves are the typical way cost-capacity relationships are defined for a given resource in energy system planning tools.…”
Section: Introduction Motivation Literature Review and Research Gapsmentioning
confidence: 99%