Municipal Emergency Plans in Italy: Requirements and drawbacks

Abstract: In order to highlight the strengths and weaknesses of land use planning and emergency planning policies and strategies in EU, the Italian regulations and guidelines are used as example to discuss the distance between the European and national regulation and the disaster management and post-disaster procedures, that together with the land use planning are often conceived for a Municipal scale. Both anthropic and natural risks are dealt with in the emergency planning, but risk information derive from very divers… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
3
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
8
2

Relationship

1
9

Authors

Journals

citations
Cited by 19 publications
(5 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…the Australian framework for major hazard facilities relies on Seveso II and the New Zealand framework is based on the Australian legislation). In this regard, it seems still evident the need of approaching both land use and emergency planning, conceiving risk assessment as part of an integrated process composed by many important and interrelated phases, not only post-disaster emergency, but also structural interventions for the long-term prevention (Pilone al., 2016).…”
Section: Resultsmentioning
confidence: 99%
“…the Australian framework for major hazard facilities relies on Seveso II and the New Zealand framework is based on the Australian legislation). In this regard, it seems still evident the need of approaching both land use and emergency planning, conceiving risk assessment as part of an integrated process composed by many important and interrelated phases, not only post-disaster emergency, but also structural interventions for the long-term prevention (Pilone al., 2016).…”
Section: Resultsmentioning
confidence: 99%
“…ELC [73][74][75] is the capacity of an urban settlement to keep-in spite of the earthquake and the consequent physical damages and functional hindrances-the functionality and operativity of almost all the activities crucial for emergency [76,77], including accessibility and connection to the territorial context, also in case of urban functions' interruption, including the dwelling one [78][79][80][81][82][83].…”
Section: The Case Studymentioning
confidence: 99%
“…In the final consequence, the effective preparation of the territory has been for possible disasters disrupted. In the future, it will be desirable to create an interconnection between different types of planning documentation [26]. In some cases, the studies also confirm the need for the adjustment in existing legislation, which solve the security of the territory [27].…”
Section: Introductionmentioning