Multiple community energy storage planning in distribution networks using a cost-benefit analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
61
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 141 publications
(74 citation statements)
references
References 25 publications
0
61
0
1
Order By: Relevance
“…In most of the articles, capital recovery factor is adopted to calculate the net present value of equal annual cash flows and economic objectives. Moreover, discounted payback period and benefit-cost ratio also can be taken into consideration [92].…”
Section: Methods To Deal With Multiple Time Scalesmentioning
confidence: 99%
See 2 more Smart Citations
“…In most of the articles, capital recovery factor is adopted to calculate the net present value of equal annual cash flows and economic objectives. Moreover, discounted payback period and benefit-cost ratio also can be taken into consideration [92].…”
Section: Methods To Deal With Multiple Time Scalesmentioning
confidence: 99%
“…Economic objectives ·Minimization of investment and operation costs [23], [24], [25], [26], [30], [31], [38], [42], [46]... ·Minimization of network losses [34], [40], [41], [56], [63], [73], [84], [91], [102]... ·Maximization of net profit value [33], [44], [72], [81], [84], [92], [97], [103]...…”
Section: Objectives Of Ads Planning Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…Need of balancing the electricity consumption and energy system have also paved the way of CES installation tremendously . The role of CES for shifting the load demand and energy surplus in real‐time framework has been investigated in Parra et al The performance and cost‐benefits analysis with CES has been done in Sardi et al considering the time‐shift impact of solar PV power generations. Optimal allocation of multiple CES system in active distribution network for economic assessment has been done in Liu et al Optimal design of community battery energy storage through discrete continuous particle swarm optimization considering the impact of prosumers has been discussed in El‐Batawy and Morsi .…”
Section: Introductionmentioning
confidence: 99%
“…In another study, a coordinated hierarchical control scheme is presented for static synchronous compensators (STATCOM) and BESS in order to mitigate the overvoltage problem, but, cost/benefit analysis is not performed for the BESS [9]. Cost/benefit analysis is performed in [10] to determine the optimal location and size (without optimal operation) of community energy storage (CES) by considering energy arbitrage, peak power generation, energy loss reduction, upgrade deferral of transmission and distribution (T&D) systems, CO2 emission 4 reduction, and reactive power support. BESS is applied in [11] for peak shaving and smoothing the distribution load profile.…”
Section: Introductionmentioning
confidence: 99%