1999
DOI: 10.1061/(asce)0733-9364(1999)125:1(23)
|View full text |Cite
|
Sign up to set email alerts
|

Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
48
0
2

Year Published

2005
2005
2022
2022

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 78 publications
(50 citation statements)
references
References 6 publications
0
48
0
2
Order By: Relevance
“…Over the last 30 years, many researchers studied the resource-leveling problem in construction projects. Thorough reviews of these studies could be found in many publications [3,9,10].…”
Section: Introductionmentioning
confidence: 99%
“…Over the last 30 years, many researchers studied the resource-leveling problem in construction projects. Thorough reviews of these studies could be found in many publications [3,9,10].…”
Section: Introductionmentioning
confidence: 99%
“…Evolutionary and genetic algorithms (EAs/GAs) [39,40] and simulated annealing (SA) [41] are the most popular metaheuristic methods for solving the RLP. Hybrid methods are presented by Son and Skibniewski [41], and by Alsayegh & Hariga [42], with a new approach for the RLP which considers the cost of splitting the non-critical activities and combines the particle swarm optimization (PSO) and simulated annealing (SA) methods.…”
Section: Metaheuristic Algorithmsmentioning
confidence: 99%
“…Hybrid methods are presented by Son and Skibniewski [41], and by Alsayegh & Hariga [42], with a new approach for the RLP which considers the cost of splitting the non-critical activities and combines the particle swarm optimization (PSO) and simulated annealing (SA) methods. A hyperheuristic approach implemented within commercial project management software has been proposed by Koulinas and Anagnostopoulus [43].…”
Section: Metaheuristic Algorithmsmentioning
confidence: 99%
“…A genetic algorithm-based multi-resources leveling model is established in the literature [7]. A kind model with simulated annealing method is presented to solve such problems in the literature [8]. These above studies are all based on the assumption that resource intensity of activity can not change, but in some cases, this assumption is unreasonable.…”
Section: Introductionmentioning
confidence: 99%