The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm

Abstract: THE RESOURCE LEVELING PROBLEM WITH MULTIPLE RESOURCES USING AN ADAPTIVE GENETIC ALGORITHMPonz-Tienda, J.L.Yepes, V.Pellicer, E.Moreno-Flores, J. Title Page THE RESOURCE LEVELING PROBLEM WITH MULTIPLE RESOURCES USING AN ADAPTIVE GENETIC ALGORITHM AbstractResources management ensures that a project is completed on time and at cost, and that its quality is as previously defined; nevertheless, resources are scarce and their use in the activities of the project leads to conflicts in the schedule. Resource leveling … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
56
0
3

Year Published

2015
2015
2022
2022

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 84 publications
(59 citation statements)
references
References 44 publications
0
56
0
3
Order By: Relevance
“…This paper addresses this research gap through the formulation of optimization models of resource leveling problems which employ the objective of minimizing the fluctuation of resource profiles while being enabled to explore potential schedules beyond networks' original duration. It is worth mentioning here that it was not until very recently that devising schedules beyond original project duration to enhance resource leveling attracted research efforts in resource levelling (Ponz-Tienda et al 2013). …”
Section: Research Significancementioning
confidence: 99%
See 1 more Smart Citation
“…This paper addresses this research gap through the formulation of optimization models of resource leveling problems which employ the objective of minimizing the fluctuation of resource profiles while being enabled to explore potential schedules beyond networks' original duration. It is worth mentioning here that it was not until very recently that devising schedules beyond original project duration to enhance resource leveling attracted research efforts in resource levelling (Ponz-Tienda et al 2013). …”
Section: Research Significancementioning
confidence: 99%
“…A knowledge-based GA multi-objective approach for stochastic extended resource investment project scheduling problems (Xiong et al 2014). Adaptive genetic algorithm was used to solve the resource leveling problems with multiple resources allowing the extension of the project deadline with a penalty (Ponz-Tienda et al 2013). An ant colony (AC) resource leveling optimization model was developed by Ding and Wang (2011).…”
Section: Introductionmentioning
confidence: 99%
“…Since 2002, Lalescu has been devoted to studying the application of genetic algorithms in course scheduling systems and developed the software FET. However, the rules and conditions of course scheduling in foreign countries differ from those in China [12] [13].…”
Section: State Of Artmentioning
confidence: 99%
“…In construction management, natureinspired algorithms have been used to solve problems such as project site layout [8], time-cost trade-off [9], and resource leveling [10]. In structural engineering, examples of nature-inspired applications include: truss design [11,12] and frame design [13].…”
Section: Introductionmentioning
confidence: 99%