2014
DOI: 10.1080/00207543.2014.948575
|View full text |Cite
|
Sign up to set email alerts
|

Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 32 publications
(11 citation statements)
references
References 18 publications
0
11
0
Order By: Relevance
“…Finally, a different version of the APFSP—in which the assembly stage has also parallel machines—has been studied by Mozdgir et al. () and Shoaardebili and Fattahi (). These works consider minimization of the makespan and minimization of the sum of weighted tardiness and earliness, respectively.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Finally, a different version of the APFSP—in which the assembly stage has also parallel machines—has been studied by Mozdgir et al. () and Shoaardebili and Fattahi (). These works consider minimization of the makespan and minimization of the sum of weighted tardiness and earliness, respectively.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In the first assumption, some researchers considered one maintenance period in the horizon, for example the authors of [15][16][17] focused on scheduling resumable jobs in two-machine flow shops and the authors of [18,19] focused on the non-resumable jobs. Some researchers considered that the intervals are periodically fixed, for example the authors of [20][21][22] investigated the two-machine flow shops and the authors of [23,24] studied the multi-machine flow shops. In the second assumption, some researchers considered that the continuous working time of machine must be smaller than a threshold, for example the authors of [25] compared the difference between fixed constraint and flexible constraint.…”
Section: Literature Reviewmentioning
confidence: 99%
“…• The problem DP m → F 2|a i , pmtn−semi|F l ( C j , T j , E j ) is tackled by Shoaardebili and Fattahi (2015), who present multi-objective metaheuristics.…”
Section: Flowshop-type In the Assembly Stage: Dp M → F M And Dp M → Hmentioning
confidence: 99%