2019
DOI: 10.1007/978-3-030-19093-4_10
|View full text |Cite
|
Sign up to set email alerts
|

Multi-criteria Decision Analysis in the Railway Risk Management Process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…11). Below, one can see a sample assessment of security variants for the case of breaking the traction due to icing conducted manually, without any software support, by the expert (the use case is described with more details in [44]). The system presents a ranking of various options as well as a ranking of assessment criteria obtained by a given expert.…”
Section: Use Casesmentioning
confidence: 99%
“…11). Below, one can see a sample assessment of security variants for the case of breaking the traction due to icing conducted manually, without any software support, by the expert (the use case is described with more details in [44]). The system presents a ranking of various options as well as a ranking of assessment criteria obtained by a given expert.…”
Section: Use Casesmentioning
confidence: 99%
“…In addition to the use of the AHP embedded in the CTR, there are known attempts to use the AHP in railroad management, which are also listed in the article [7], with examples using MCDA methods (the already mentioned AHP, or ANP-Analytic Network Process) to plan transport routes for passengers or cargo trains [8], to assess alternatives for a transport network's development [9] and how to apply AHP to railway safety [10]. The AHP method, in combination with other methods, is increasingly a part of quantitative evaluation systems, including environmental aspects, related to railroads.…”
Section: Introductionmentioning
confidence: 99%
“…Risk engineers will use different methods for risk assessment and internal reporting in different problem situations [4]. Evaluation approaches used to determine the criteria, guidelines, and factors include the checklist, brainstorming, HAZOP, FMEA, structured what if technique (SWIFT), root cause analysis (RCA), primary hazard analysis (PHA), FTA, event tree analysis (ETA), and Ishikawa diagram approaches [30].…”
mentioning
confidence: 99%