MRP rescheduling heuristics with capacity extension under deterministic demand

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2013
2013
2019
2019

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 10 publications
0
4
0
Order By: Relevance
“…We also review other approaches related to production systems with multiple machines, such as modeling multistage systems (Aghezzaf et al, 2010;Asmundsson et al, 2009;Li et al, 2006a;Rong et al, 2006;Selcuk et al, 2006;Stadtler and Sahling, 2012;Van den broecke et al, 2008), production lines (Baptiste et al, 2008;Christou and Ponis, 2009;Christou et al, 2007;Ferreira et al, 2009;Mehrotra et al, 2011;Taskin and Uenal, 2009) and groups of identical machines (Albey and Bilge, 2011). Table 10 summarizes the different approaches related to multiple and parallel machines extensions.…”
Section: 6c Production Timesmentioning
confidence: 99%
See 1 more Smart Citation
“…We also review other approaches related to production systems with multiple machines, such as modeling multistage systems (Aghezzaf et al, 2010;Asmundsson et al, 2009;Li et al, 2006a;Rong et al, 2006;Selcuk et al, 2006;Stadtler and Sahling, 2012;Van den broecke et al, 2008), production lines (Baptiste et al, 2008;Christou and Ponis, 2009;Christou et al, 2007;Ferreira et al, 2009;Mehrotra et al, 2011;Taskin and Uenal, 2009) and groups of identical machines (Albey and Bilge, 2011). Table 10 summarizes the different approaches related to multiple and parallel machines extensions.…”
Section: 6c Production Timesmentioning
confidence: 99%
“…Furthermore, setup limitations are caused by not considering setup times (Asmundsson et al, 2009;Brahimi et al, 2010;Deng and Yano, 2006;Gicquel et al, 2009;Grubbstrom and Huynh, 2006a), setup carry-overs (Helber and Sahling, 2010;Kaczmarczyk, 2011;Nascimento et al, 2010), setup sequencedependents (Goren et al, 2012;Mohan et al, 2012;Ozturk and Ornek, 2010) or setup groups (Absi and Kedad-Sidhoum, 2008). Moreover, Bjork and Carlsson (2007) and Merzifonluoglu et al (2007) do not reflect lead time flexibility, while Aghezzaf et al (2007), Kanyalkar and Adil (2007) and Rong et al (2006) assume that lead times are zero. Alwan et al (2008), Brandimarte (2006), Kanyalkar and Adil (2007) and Selcuk et al (2006) do not include safety stocks as a model parameter in their proposals.…”
Section: Limitationsmentioning
confidence: 99%
“…The development of operations planning applications that consider capacity constraints occupies a relatively common place in the literature (Drexl and Kimms, 1997). The consideration of multi-level systems creates numerous ways of covering capacity constraints and, should they be required, the need for not exceeding this capacity (Rong et al, 2006). Yet, tackling the problem from the mathematical programming perspective is more likely to be a good mechanism, as suggested by Segerstedt (1996b), who indicates that formulas are the "supreme methods for communication".…”
Section: The Mrpii Mathematical Formulationmentioning
confidence: 99%
“…The development of operations planning applications that consider capacity constraints occupies a relatively common place in the literature (Drexl y Kimms, 1997). The consideration of multi-level systems creates numerous ways of covering capacity constraints and, should they be required, the need for not exceeding this capacity (Rong et al, 2006). Yet tackling the problem from the mathematical programming perspective is more likely to be a good mechanism, as suggested by Segerstedt (1996b), who indicates that formulas are the "supreme methods for communication".…”
Section: The Mrpii Mathematical Formulationmentioning
confidence: 99%