2013
DOI: 10.24084/repqj11.277
|View full text |Cite
|
Sign up to set email alerts
|

Mooring for floating offshore renewable energy platforms classification

Abstract: Abstract. Renewable marine energy has emerged as a centrepiece of the new energy economy, because of its abundance, regularity and to be environmentally -friendly. However, its exploitation in a commercial way is constrained due to several engineering problems. One of the mayor of the major constraints when installing this type of structures grounded on the seabed over 100 meters depth. One of the characteristics of the Spanish oceanic coastal shore is its high depth. So, in order to develop any kind of offsho… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 10 publications
(4 reference statements)
0
1
0
Order By: Relevance
“…Firstly, the tension leg platform (TLP) and Spar configurations do not meet the mobility function for the unit, due to its mooring complexity and large draft, respectively [49][50][51][52]. Moreover, the semisubmersible is less favorable for Egyptian shipyards because of its complex structure [53,54]. In addition, the semisubmersible's uncertainty in terms of the stability of the structure with a wind turbine in operation and during the towing process was considered a disadvantage [55].…”
Section: Platform Criteriamentioning
confidence: 99%
“…Firstly, the tension leg platform (TLP) and Spar configurations do not meet the mobility function for the unit, due to its mooring complexity and large draft, respectively [49][50][51][52]. Moreover, the semisubmersible is less favorable for Egyptian shipyards because of its complex structure [53,54]. In addition, the semisubmersible's uncertainty in terms of the stability of the structure with a wind turbine in operation and during the towing process was considered a disadvantage [55].…”
Section: Platform Criteriamentioning
confidence: 99%