1983
DOI: 10.1109/mper.1983.5519583
|View full text |Cite
|
Sign up to set email alerts
|

Modification of Power System Operation for Significant Wind Generation Penetration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0

Year Published

1991
1991
2015
2015

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 18 publications
(14 citation statements)
references
References 1 publication
0
14
0
Order By: Relevance
“…f = 0. (8), the probability of loss of load (10) and the binary status (15). (e) The product of these three terms in step (d) is the EENS owing to forecast errors and unit outages.…”
Section: Formulation Of Expected Energy Not Served (Eens)mentioning
confidence: 99%
See 1 more Smart Citation
“…f = 0. (8), the probability of loss of load (10) and the binary status (15). (e) The product of these three terms in step (d) is the EENS owing to forecast errors and unit outages.…”
Section: Formulation Of Expected Energy Not Served (Eens)mentioning
confidence: 99%
“…Many studies on UC with WTG integration were conducted over the past few decades [15][16][17][18][19][20]. The modification of UC, economic dispatch (ED) and various frequency controls for a significant wind generation capacity is discussed in [15].…”
Section: Introductionmentioning
confidence: 99%
“…Unit commitment for systems with large-scale wind power was firstly studied more than 20 years ago [3][4][5]. In these studies, practical and concise power control algorithms were proposed.…”
Section: Introductionmentioning
confidence: 99%
“…An economic dispatch model was developed in [10] by applying genetic algorithm. The incorporation of wind energy conversion system in power system unit commitment and economic dispatch was discussed in [11]. A co-ordinated wind-thermal dispatch using direct search method was presented in [12].…”
Section: Introductionmentioning
confidence: 99%