Modeling and Simulation of Project Management through the PMBOK® Standard Using Complex Networks

Abstract: Discussion about project management, in both the academic literature and industry, is predominantly based on theories of control, many of which have been developed since the 1950s. However, issues arise when these ideas are applied unilaterally to all types of projects and in all contexts. In complex environments, management problems arise from assuming that results, predicted at the start of a project, can be sufficiently described and delivered as planned. Thus, once a project reaches a critical size, a cale… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0
2

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 16 publications
(14 citation statements)
references
References 81 publications
0
10
0
2
Order By: Relevance
“…The objective function (1), model constraints (2), (3) were determined, and the choice of the optimum variant of the duration of works was considered taking into account the minimization of time and expenses (4), (5). The algorithm implies determining the weight factors using expert estimations (the method of direct estimation) (6), (7), and the elements of combinatorics for finding the possible combinations of the duration of project stages (8).…”
Section: Discussion Of Results Of the Study Into Determining The Optimentioning
confidence: 99%
See 2 more Smart Citations
“…The objective function (1), model constraints (2), (3) were determined, and the choice of the optimum variant of the duration of works was considered taking into account the minimization of time and expenses (4), (5). The algorithm implies determining the weight factors using expert estimations (the method of direct estimation) (6), (7), and the elements of combinatorics for finding the possible combinations of the duration of project stages (8).…”
Section: Discussion Of Results Of the Study Into Determining The Optimentioning
confidence: 99%
“…The developed model, unlike the models in papers [5][6][7][8][9][10][11][12][13], takes into consideration the peculiarities of a particular project, is a combination of the methods of expert evaluation and modeling. The objective function is the probability of successful project implementation.…”
Section: Discussion Of Results Of the Study Into Determining The Optimentioning
confidence: 99%
See 1 more Smart Citation
“…A good simulation model allows for properties of the project planning and schedules to be depicted, ascertained, and predicted [14,15]. Furthermore, it is important to bear in mind that the way the schedule is developed has a significant influence on the overall management of any project [16].…”
Section: Stochastic Model Of the Schedulementioning
confidence: 99%
“…In other cases of uncertainty, however, the duration uncertainty may be represented by random variables with different continuous general distributions (i.e., truncated normal distribution, uniform and exponential). The effect that uncertain durations exert on the makespan of a complex operation network can only be evaluated by simulations [55].…”
Section: Analysis Of Uncertainmentioning
confidence: 99%