2011
DOI: 10.1016/j.ijpe.2011.01.008
|View full text |Cite
|
Sign up to set email alerts
|

Modeling and simulation of order-driven planning policies in build-to-order automobile production

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
25
0

Year Published

2011
2011
2021
2021

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 66 publications
(29 citation statements)
references
References 24 publications
0
25
0
Order By: Relevance
“…A framework and models to improve order-driven planning in automotive production are presented by Volling and Spengler [13]. The presented framework involves separate, interlinked mathematical models for order promising and master production scheduling.…”
Section: Literature Reviewmentioning
confidence: 99%
“…A framework and models to improve order-driven planning in automotive production are presented by Volling and Spengler [13]. The presented framework involves separate, interlinked mathematical models for order promising and master production scheduling.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Fisher (2001) has presented a thorough overview of the studies which had investigated ATP concept. Some have tried to extend its concept and presented new models (Jeong et al, 2002;Xiong et al, 2003;Volling & Spengler, 2011;Cheng & Cheng, 2011). many studies have considered ATP concept with various assumptions to make it applicable in different production environments (Zhao & O.Ball, 2005;Tsai & Wang, 2008;Lin et al, 2010;Chen-Ritzo et al, 2011;Alemany et al, 2013).…”
Section: Concepts and Literature Reviewmentioning
confidence: 99%
“…There is a large portion of industries that work with MTF production system and ATP mechanism can help them improve their production planning. On the other hand, all studies in the literature consider batch mode Advanced ATP (Zhao & O.Ball, 2005;Lin et al, 2010;Cheng & Cheng, 2011) or real-time mode (Volling & Spengler, 2011). Moreover, as the last found gap in ATP literature, most of the reviewed studies have not considered backlog costs.…”
Section: Concepts and Literature Reviewmentioning
confidence: 99%
“…This work assumes that all orders must be processed and presents models that minimize make-span or lateness in a single machine environment. Volling and Spengler (2011) develop a model for simultaneous due date quoting and master production scheduling in make-to-order (MTO) automobile production. However, in this model, all orders must be accepted.…”
Section: Production Planning In Ato Manufacturingmentioning
confidence: 99%