Meteorological Risk Analysis of Port Crane Operations and Warning Managements

Abstract: AbstractsWith the rapid development of China's marine economy and the port economy, involved in the work of the security problem is becoming more and more prominent, especially the crane operation risk relates to the port operation, which gets more attention. The operational risk and the early warning and scheduling should be

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…According to the overhead transmission line outage record of the State Grid Company of China from 1999 to 2003 , transmission line outages were mainly triggered by temporary trips due to conductor galloping and lightning, while outages caused by conductor damage only accounted for less than 10% of all outages. However, most of the trips are temporary and can be restored within several minutes.…”
Section: Outage Rate Estimation Methods For Overhead Transmission Linementioning
confidence: 99%
“…According to the overhead transmission line outage record of the State Grid Company of China from 1999 to 2003 , transmission line outages were mainly triggered by temporary trips due to conductor galloping and lightning, while outages caused by conductor damage only accounted for less than 10% of all outages. However, most of the trips are temporary and can be restored within several minutes.…”
Section: Outage Rate Estimation Methods For Overhead Transmission Linementioning
confidence: 99%
“…The Chongqing University team performed the fitting of the fault downtime time by analyzing the historical data from the fault trip to the success of power transmission again. It used the traditional function to obtain the distribution model of the fault shutdown time [14]. Still, the comparison of the maximum likelihood estimate by the traditional function cannot intuitively indicate the advantages and disadvantages of the model.…”
Section: Introductionmentioning
confidence: 99%