Medium and long term load forecasting method for distribution network with high penetration DGs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 15 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…As an important part of planning and construction, medium-and long-term load forecasting of distribution network plays an important role in network architecture optimization, selection of new energy access point, distribution transformer overload warning and other scenarios. Therefore, it is necessary to carry out in-depth research on medium-and long-term load forecasting of distribution network (Zhao et al, 2014).…”
Section: Introductionmentioning
confidence: 99%
“…As an important part of planning and construction, medium-and long-term load forecasting of distribution network plays an important role in network architecture optimization, selection of new energy access point, distribution transformer overload warning and other scenarios. Therefore, it is necessary to carry out in-depth research on medium-and long-term load forecasting of distribution network (Zhao et al, 2014).…”
Section: Introductionmentioning
confidence: 99%
“…The distribution network planning is carried out on the basis of load forecasting and substation site selection and capacity, which has a direct and significant impact on the economics and reliability of distribution network construction and operation [1]- [3]. Distribution network planning requires the combination of geographic information to determine the spatial layout of the line, contact object selection, load division and other issues.…”
Section: Introductionmentioning
confidence: 99%
“…Accurate load forecasting can start and stop a power system generator set both economically and reasonably, and plays an important role in maintaining the security and stability of the power grid operation, maintaining the normal production and life of society, and effectively reducing the generation costs [5]. Load forecasting can be divided into four categories; super short-term, short-term, medium-term, and long-term based on different purposes, and their time ranges of forecasting are within 1 h in the future, one day or a week, one month to one year, and 3 to 5 years in the future, respectively [6][7][8]. This paper mainly makes a short-term load forecasting of user electricity load.…”
Section: Introductionmentioning
confidence: 99%