Practical Automatic Planning for MV Distribution Network Considering Complementation of Load Characteristic and Power Supply Unit Partitioning

Abstract: A new practical automatic planning method for MV distribution network considering complementation of load characteristic and division of power supply is presented to solve the problems of large network size and low equipment utilization ratio caused by the lack of consideration of complementation of load characteristic in distribution network planning. First, based on the existing research results on load clustering and grid planning, the concepts of MV distribution network feeder block and power supply unit a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 11 publications
0
4
0
Order By: Relevance
“…For the standard example system, due to the lack of historical data, it is not possible to directly use the historical "wind power-load" time series data for scene clustering. In order to verify the method proposed in this paper, the time series model of reference [24] is used to generate the "wind power-load" time series data. After obtaining the "wind power-load" scene data through time series simulation, the scene clustering and representative typical scene extraction based on the K-medoids method are carried out, and five types of representative scene centers are obtained as shown in Tab.…”
Section: Sample Generationmentioning
confidence: 99%
“…For the standard example system, due to the lack of historical data, it is not possible to directly use the historical "wind power-load" time series data for scene clustering. In order to verify the method proposed in this paper, the time series model of reference [24] is used to generate the "wind power-load" time series data. After obtaining the "wind power-load" scene data through time series simulation, the scene clustering and representative typical scene extraction based on the K-medoids method are carried out, and five types of representative scene centers are obtained as shown in Tab.…”
Section: Sample Generationmentioning
confidence: 99%
“…Currently, research regarding grid planning for MV distribution networks has also achieved progress. Literature [15] proposes a practical automatic routing method for MV distribution networks that takes into account the complementary characteristics of loads and the division of power supply units. However, it fails to maximize the utilization of system resources because it does not consider the planning of distribution networks under the condition of DG grid connection.…”
Section: Introductionmentioning
confidence: 99%
“…Literature [1] defines the multi-level modular structure and functions at each level of the distribution network, and proposes the planning process and division method for each level. Based on the geographical boundary constraints and the quantity constraints of power supply units, literature [2] optimizes and combines the grids with high boundary coincidence degree, and proposes the evaluation index of grid boundary degree to divide power supply units. In literature [3], a mathematical model of project life cycle cost considering power failure loss factors was constructed, and a new distribution grid planning method based on capacity and power supply reliability, that is, double Q, was proposed.…”
Section: Introductionmentioning
confidence: 99%