Mechanical response of surrounding rock of tunnels constructed with the TBM and drill-blasting method

Abstract: There are two kinds of excavation methods in underground engineering: the tunnel boring machine (TBM) and the drill-blasting method. A large number of studies have shown that the deformation and failure, the degree of disturbance, the stability and the reinforcement measures of surrounding rock using the TBM and drill-blasting method vary from each other. To accurately master these macroscopic damages, it is necessary to focus on the investigation of the micro-mechanical responses of the surrounding rock. Scan… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 19 publications
(7 citation statements)
references
References 17 publications
(13 reference statements)
0
7
0
Order By: Relevance
“…he main methods for rocks excavations are Drill-and-Blast (DB), and Tunnel Boring Machine (TBM) [10,11]. The process of rocks removal is very different in the two mentioned tunnelling methods.…”
Section: General Rocks Excavations Methods Overviewmentioning
confidence: 99%
“…he main methods for rocks excavations are Drill-and-Blast (DB), and Tunnel Boring Machine (TBM) [10,11]. The process of rocks removal is very different in the two mentioned tunnelling methods.…”
Section: General Rocks Excavations Methods Overviewmentioning
confidence: 99%
“…Although explosive blasting has been the most widely used rock breaking technique due to the high efficiency and low cost [4,5]. However, during the rock mass excavation of the bench in a complicated environment, it is severely restricted due to the strong blasting hazards [6,7]. Therefore, it is crucial and urgent to develop a novelty excavation method used in the area with harsh conditions.…”
Section: Introductionmentioning
confidence: 99%
“…Usually, the subway tunneling is achieved by shield machines [6,7], but due to the turning curvature limitation and geological or economical issues, the drill-and-blasting method has to be adopted [8] in many cases, which will inevitably cause vibration problem on surrounding rock mass and adjacent structures. For existing tunnels near subway tunneling, possible dynamic damage to their lining should be evaluated before any hazard occurs, especially in the mountainous area Southwest China, where drill-and-blasting is more commonly used.…”
Section: Introductionmentioning
confidence: 99%