2001
DOI: 10.1016/s1474-6670(17)40867-6
|View full text |Cite
|
Sign up to set email alerts
|

Mathematical Modelling of the Processes in Integrated Municipal Wastewater Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2002
2002
2007
2007

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 75 publications
0
2
0
Order By: Relevance
“…First model of WWTP in SIMBA has to be calibrated. Methods for SIMBA model calibration are presented in [2]. When calibrated model in SIMBA is available then it can be used as a data generator for learning the SSWN.…”
Section: Monitoring Of Wwtp For Supervisory Control Purposesmentioning
confidence: 99%
“…First model of WWTP in SIMBA has to be calibrated. Methods for SIMBA model calibration are presented in [2]. When calibrated model in SIMBA is available then it can be used as a data generator for learning the SSWN.…”
Section: Monitoring Of Wwtp For Supervisory Control Purposesmentioning
confidence: 99%
“…Several models to represent activated sludge wastewater plants have been proposed. A good overview of different models can be found in Chotkowski et al, (2001) and Brdys and Zhang (1999).…”
Section: Wastewater System Description and Modellingmentioning
confidence: 99%