Marlim 3 Phase Subsea Separation System - Challenges and Solutions for the Subsea Separation Station to Cope with Process Requirements

Abstract: This paper presents the experience brought from the oil-water subsea separatorproject developed for the Marlim field, known as SSAO Marlim. Here, it will beaddressed the inherent arising challenges from a project of a subsea separationequipment, from the subsea mechanical design perspective, with special focus tothe additional requirements to the normally presented in conventional subseaequipment for oil and gas production. It will be part of the discussion the architecture selected for the s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
15
0
3

Year Published

2015
2015
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 23 publications
(21 citation statements)
references
References 0 publications
0
15
0
3
Order By: Relevance
“…Water is then re-injected into the reservoir via a subsea water injection pump [R. Orlowski, 2012]. Several stages may be needed to reach a quality of 50 ppm OiW (a typical requirement).…”
Section: System Descriptionmentioning
confidence: 99%
See 1 more Smart Citation
“…Water is then re-injected into the reservoir via a subsea water injection pump [R. Orlowski, 2012]. Several stages may be needed to reach a quality of 50 ppm OiW (a typical requirement).…”
Section: System Descriptionmentioning
confidence: 99%
“…Opawale, 2014], as performed in Marlim SSAO [R. Orlowski, 2012]. Such systems enable removal of sand that settles in gravity separators but they also directly remove sand from the well stream using a cyclonic separator [A.…”
Section: Technology Maturity Statusmentioning
confidence: 99%
“…Enquanto isso, o óleo e o gás são extraídos simultaneamente do separador e direcionados para o FPSO através de risers de produção. (Orlowski et al, 2012). A água e a areia produzidas separadas do óleo são reinjetadas no reservatório através de uma bomba centrífuga.…”
Section: Marlim (Brasil)unclassified
“…Orlowski et al (2012) mencionam que foram considerados diversos critérios para se definir quais os itens do sistema seriam recuperáveis para a superfície, tais como a taxa de falha, a partir de experiências passadas com itens semelhantes, e a análise dos impactos da falha do componente sobre o sistema.…”
Section: Marlim (Brasil)unclassified
See 1 more Smart Citation