Market-Based Transmission Expansion Planning

Abstract: Abstract-Restructuring and deregulation has exposed transmission planner to new objectives and uncertainties. Therefore, new criteria and approaches are needed for transmission planning in deregulated environments. A new market-based approach for transmission planning in deregulated environments is presented in this paper. The main contribution of this research is: i) introducing a new probabilistic tool, named probabilistic locational marginal prices, for computing the probability density functions of nodal p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
129
0
4

Year Published

2009
2009
2020
2020

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 241 publications
(136 citation statements)
references
References 14 publications
(11 reference statements)
0
129
0
4
Order By: Relevance
“…By now, several market-based criteria such as total congestion cost of the transmission network [3,8,27], standard deviation of the mean of the LMPs [3,27] and Lerner index [6,7] have been presented to evaluate transmission network from the viewpoint of market.…”
Section: Comparison Of Market-based Criteriamentioning
confidence: 99%
“…By now, several market-based criteria such as total congestion cost of the transmission network [3,8,27], standard deviation of the mean of the LMPs [3,27] and Lerner index [6,7] have been presented to evaluate transmission network from the viewpoint of market.…”
Section: Comparison Of Market-based Criteriamentioning
confidence: 99%
“…We assume that the system operator dispatches generating resources to minimize the total costs of generation and unserved energy ( ) across all the nodes. The aim is to find an optimal vector of power generated at all the nodes and power consumed at all the nodes that minimizes system costs at any time: 14 s.t. The first four restrictions set the environment as determined by the operation state of the physical assets.…”
Section: Economic Environmentmentioning
confidence: 99%
“…The components of the power system are subject to limits. Actual 14 In addtion to carbon dioxide emissions there can be others ( , , ..) which are valued. If so, the objective function could include another term.…”
Section: Economic Environmentmentioning
confidence: 99%
See 1 more Smart Citation
“…However, the competition among GenCos was not considered. Buygi et al proposed a market-based transmission expansion planning approach that facilitates market competition by enabling a flat price profile throughout the transmission network [7]. The flatness of locational price, which means lack of congestion, was taken as the proper criterion for measuring the degree of competitiveness of the transmission network.…”