2005
DOI: 10.1061/(asce)1076-0431(2005)11:1(25)
|View full text |Cite
|
Sign up to set email alerts
|

Manufactured Housing Production Layout Design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
17
0
1

Year Published

2006
2006
2021
2021

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 23 publications
(19 citation statements)
references
References 1 publication
0
17
0
1
Order By: Relevance
“…Kim et al [1] and Kim et al [15] observed the same problem, referred to as a bottleneck or congestion of work. is bottleneck is cited as a major problem in the modular process in other studies [9,16,17]. Generally, to reduce the required construction time, more manpower and equipment can be added at a typical construction site.…”
Section: Issues In Korean Modular Factory Manufacturing Processmentioning
confidence: 99%
See 1 more Smart Citation
“…Kim et al [1] and Kim et al [15] observed the same problem, referred to as a bottleneck or congestion of work. is bottleneck is cited as a major problem in the modular process in other studies [9,16,17]. Generally, to reduce the required construction time, more manpower and equipment can be added at a typical construction site.…”
Section: Issues In Korean Modular Factory Manufacturing Processmentioning
confidence: 99%
“…Studies related to improving modular system production have been performed by other researchers [7][8][9][10][11][12][13]. However, it is difficult to apply their findings to Korean factories owing to the different criteria in production, productivity, manpower, material, and laws.…”
Section: Introductionmentioning
confidence: 99%
“…Assim, uma casa manufaturada é produzida em um ambiente controlado de uma fábrica e, uma vez concluída, é transportada para o destino final no qual será instalada e conectada com as demais instalações, como fundações e sistemas prediais (MEHROTRA; SYAL; HASTAK, 2005). Os autores mostram que, para a montagem da unidade habitacional, são necessárias várias estações de trabalho de diferentes tipos, as quais podem estar agrupadas em linhas principais, células de produção ou em linhas alimentadoras.…”
Section: Metodologiaunclassified
“…The manufactured housing industry seized the value of lean manufacturing on process improvement. Two major streams of research in this area were plant layouts optimization based on lean principles and lean implementation plan development using simulation (Senghore et al 2004;Mehrotra et al 2005;Jeong et al 2006).…”
Section: Introductionmentioning
confidence: 99%