2021
DOI: 10.1016/j.enbuild.2021.110984
|View full text |Cite
|
Sign up to set email alerts
|

Managing the uncertainty of the U-value measurement using an auxiliary set along with a thermal camera

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 45 publications
0
4
0
Order By: Relevance
“…The obtained values of coefficients c and contributions of uncertainty u(ω) are presented in Table 1. Evaluation of uncertainty budget in tables can be seen in other articles [44][45][46]. The value of u(ω) shown in the bottom right corner of the table was determined by means of Formula (22).…”
Section: The Uncertainty Budgetmentioning
confidence: 99%
“…The obtained values of coefficients c and contributions of uncertainty u(ω) are presented in Table 1. Evaluation of uncertainty budget in tables can be seen in other articles [44][45][46]. The value of u(ω) shown in the bottom right corner of the table was determined by means of Formula (22).…”
Section: The Uncertainty Budgetmentioning
confidence: 99%
“…The work highlighted some practical advices as well as the need for proper Region of Interest (ROI) selection, to reduce errors. In the work by Papadakos et al [138], the envelope of an existing building (made by porous clay bricks or perforated bricks) was investigated with HFM, theoretical method and via QIRT.…”
Section: Quantitative Infrared Thermography (Qirt)mentioning
confidence: 99%
“…The budget is presented in Table 1. Evaluation of uncertainty budget in tables can be seen in other articles [29], [30]. Similarly, on the basis of equation ( 6), the uncertainty budget for τa was determined.…”
Section: The Uncertainty Budgetmentioning
confidence: 99%