Managing engineering changes in the engineer-to-order environment: challenges and research needs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
2
0
7

Year Published

2018
2018
2024
2024

Publication Types

Select...
3
3
1

Relationship

1
6

Authors

Journals

citations
Cited by 16 publications
(9 citation statements)
references
References 35 publications
0
2
0
7
Order By: Relevance
“…It is important to understand the effects of change propagation not only on engineering drawings, but also on the downstream activities of production, supply and procurement. The focus of previous research on EC propagation has mainly been on the engineering phase, without proper consideration of implications for the physical production phase or associated supply chain [8].…”
Section: Engineering Change Managementmentioning
confidence: 99%
“…It is important to understand the effects of change propagation not only on engineering drawings, but also on the downstream activities of production, supply and procurement. The focus of previous research on EC propagation has mainly been on the engineering phase, without proper consideration of implications for the physical production phase or associated supply chain [8].…”
Section: Engineering Change Managementmentioning
confidence: 99%
“…Milestones can be considered as being points in time where local minima of uncertainty can be established [25]: for example, milestones provide checkpoints where planned budget and time (i.e., priors) can be compared to current best estimates of expenditure and duration (i.e., preferred posteriors). From these local minima of uncertainty, new predictions of cost and time can be made, which can be based on the creation of modifications to both path and destination [92]. Although cost and time can be far more than predicted at the outset or at previous milestones, all parties can be too deep into the project to quit [93].…”
Section: Generative Modelsmentioning
confidence: 99%
“…Der Management-Ansatz des Engineering Change Managements (ECM) umfasst unterstützende Methoden zur Organisation, Implementierung und Kontrolle von Änderungsbedarfen. Eine Herausforderung ist der unsystematische Umgang mit Änderungsbedarfen in der industriellen Praxis, obwohl Methoden und Hilfsmittel des ECM in der Literatur beschrieben werden [4]. Sofern ECM-Prozesse Anwendung finden, wird das Anwendungspotenzial nicht vollständig ausgeschöpft, da die unternehmensspezifische Anpassung (Tailoring) an die vorherrschenden Rahmenbedingungen in der Regel vernachlässigt wird.…”
Section: Motivationunclassified
“…Daraus resultiert eine unvollständige Informationsgrundlage für die Änderungsentscheidung. Darüber hinaus ist die Bewertung der Änderungsauswirkungen meistens ungenau und abhängig von Expertenwissen, ohne objektive Bewertungskriterien zugrundezulegen [4]. Vor allem die Vorhersage von Änderungspropagation stellt eine große Herausforderung dar [7].…”