Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 23 publications
(8 citation statements)
references
References 10 publications
0
7
0
Order By: Relevance
“…The research category "construction and project management" (RC6) is the most trending BIM sub-field (with 78 articles) among the ten identified research categories, and it also has the highest number of research areas with 18 themes as seen in Tables 5 and 6. Trending topics in this field include RC6.1 -"construction planning and monitoring" (Faghihi et al 2016;Kim et al 2014; RC6.2 -"schedule optimization" (Altaf et al 2014;Chen et al 2013;Faghihi et al 2014;Gelisen, Griffis 2014;Kang et al 2016;Liu et al 2015a;Moon et al 2014;Tserng et al 2014;Wang et al 2014a); RC6.3 -"BIM governance platform" (Dossick, Neff 2010;Farr et al 2014;Knight 2008); RC6.4 -"Material management & quality assessment" (Chen, Luo 2014;Francom, El Asmar 2015;Kim et al 2015e), and RC6.5 -"Waste management" (Akinade et al 2015;Liu et al 2015c;Porwal, Hewage 2012;.…”
Section: Construction and Project Management (Rc6)mentioning
confidence: 99%
“…The research category "construction and project management" (RC6) is the most trending BIM sub-field (with 78 articles) among the ten identified research categories, and it also has the highest number of research areas with 18 themes as seen in Tables 5 and 6. Trending topics in this field include RC6.1 -"construction planning and monitoring" (Faghihi et al 2016;Kim et al 2014; RC6.2 -"schedule optimization" (Altaf et al 2014;Chen et al 2013;Faghihi et al 2014;Gelisen, Griffis 2014;Kang et al 2016;Liu et al 2015a;Moon et al 2014;Tserng et al 2014;Wang et al 2014a); RC6.3 -"BIM governance platform" (Dossick, Neff 2010;Farr et al 2014;Knight 2008); RC6.4 -"Material management & quality assessment" (Chen, Luo 2014;Francom, El Asmar 2015;Kim et al 2015e), and RC6.5 -"Waste management" (Akinade et al 2015;Liu et al 2015c;Porwal, Hewage 2012;.…”
Section: Construction and Project Management (Rc6)mentioning
confidence: 99%
“…findings of lapses in the study support literature (green, 1998;Serpell and Alarcon, 1998;gonzález et al, 2011;Thomas et al, 2005), which substantiate the existence of constraints in CSM. SM process lapses identified from the study, constitute areas which could benefit from infusion of technology, as substantiated by authors including: Lin et al (2014) andfang et al (2018) on h&S inspection, Razavi et al (2012), han andgolparvar-fard (2015) and Park and Brilakis (2016) on materials monitoring, Tsai, Yang and Lin (2007) and Omar and Nehdi (2016) on data collection and Kim et al (2013), Braun et al (2015) and Kang et al (2016) on-site and general construction management.…”
Section: Discussionmentioning
confidence: 77%
“…The BrIM models are also used in performing earned value analysis for assessing the performance of the project (Marzouk and Hisham, 2014). The BrIM models are used in tracking and comparing of real-time progress with the planned progress at site using n-d CAD simulation system (Kang et al, 2016).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The rapid development of construction industry requires simulation and visualisation of the projects process over time (Hallberg and Tarandi, 2011). The 4D BrIM models are capable of animating the work process and disseminating information effectively in way workers can understand and thereby achieve coordination (Kim et al, 2011;Chiu et al, 2011;Kang et al, 2013Kang et al, , 2016Liu et al, 2014;Moon et al, 2014;Chong et al, 2016).…”
Section: Application Of 4d Brimmentioning
confidence: 99%