2021
DOI: 10.1108/ecam-07-2020-0579
|View full text |Cite
|
Sign up to set email alerts
|

Management control structures and performance implications in international construction joint ventures: critical survey and conceptual framework

Abstract: PurposeManagement control is needed in international joint ventures (IJVs) for successful management and performance. While IJV management control and performance concept has been widely explored, in the construction sector, the core understanding of the design of the two concepts is still lacking. This has resulted in the neglect of important questions and directions for research and practice improvement. This study aims to conduct a critical survey of prior studies addressing the conceptualization of managem… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
19
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(19 citation statements)
references
References 92 publications
(155 reference statements)
0
19
0
Order By: Relevance
“…, 2007). If ICJV goals are to be achieved, appropriate, effective means must be employed (Tetteh et al. , 2021a).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…, 2007). If ICJV goals are to be achieved, appropriate, effective means must be employed (Tetteh et al. , 2021a).…”
Section: Introductionmentioning
confidence: 99%
“…Abdelghany and Ezeldin, 2010; Ozorhon Mitigation of contractual breaches et al, 2007). If ICJV goals are to be achieved, appropriate, effective means must be employed (Tetteh et al, 2021a). The relative poor success of ICJVs can be attributed in significant measure to the divergent habits, experiences and business practices of the different work cultures that are brought to bear on joint ventures (JVs) and the consequent complications that arise regarding project coordination (Vaara et al, 2012).…”
Section: Introductionmentioning
confidence: 99%
“…Thus, an integrated perspective of MC mechanisms impacting multiple performance goals of ICJVs has yet to be investigated. Recently, Tetteh et al (2021) proposed an integrated measurement framework for examining MC and performance impacts in ICJVs, yet it is only a literature review paper that lacks empirical evidence. Moreover, prior studies often focused on a single partner perspective, typically the foreign partner, and assume that it has a single performance goal.…”
Section: Introductionmentioning
confidence: 99%
“…It ensures the intensification of legal regulations and processes that corporations comply with to have support and legitimacy (Meyer and Scott, 1992). The interaction of environmental conditions and institutional rules often creates unique management and control values for IJVs' operation (Tetteh et al, 2021). In developing countries, for example, regulation constraints, partner culture and strategy, as well as several contextual factors connected to a partner's bargaining power during negotiations, affect the operational control arrangements.…”
Section: Introductionmentioning
confidence: 99%
“…Path analysis can provide a clear perspective for clarifying the causal relationship between factors and formulating targeted improvement measures (Yuan et al, 2018;Pereira et al, 2020). The management control of the critical path is conducive to improving the cost performance goals (Tetteh et al, 2021). Hence, based on the qualitative analysis of CIFs, a more in-depth exploration of the relationship between CIFs through quantitative analysis can discover the essence of high capital cost and effectively improve the efficiency of cost management (Zhang and Deng, 2010;Akinade et al, 2018).…”
mentioning
confidence: 99%