Impacts of management control mechanisms on the performance of international construction joint ventures: an empirical study

Abstract: PurposeWhile previous studies have focused on identifying management control (MC) mechanisms in international construction joint ventures (ICJVs), the impacts of such MC mechanisms on the performance of ICJVs remain largely unknown. This study aims to investigate the impacts of MC mechanisms on the performance of ICJVs hosted in the developing country of Ghana.Design/methodology/approachThrough a comprehensive review of the literature, a theoretical model was developed, and data were collected through a questi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 78 publications
(209 reference statements)
0
3
0
Order By: Relevance
“…At the same time, these personnel are also professional and technical management personnel. These personnel are the main managers of engineering construction, and their management ability will directly affect the safety, progress, quality, and cost of engineering construction, which is related to the survival and development of construction enterprises [19]. Therefore, effective ways must be adopted to train the project managers of high-rise buildings.…”
Section: A Overall Description Of High-rise Building Projectmentioning
confidence: 99%
See 1 more Smart Citation
“…At the same time, these personnel are also professional and technical management personnel. These personnel are the main managers of engineering construction, and their management ability will directly affect the safety, progress, quality, and cost of engineering construction, which is related to the survival and development of construction enterprises [19]. Therefore, effective ways must be adopted to train the project managers of high-rise buildings.…”
Section: A Overall Description Of High-rise Building Projectmentioning
confidence: 99%
“…Assume that X and Y are two feasible solutions of management talent training objectives, and each possible solution of management talent training objectives is a ternary vector 𝑥 = (𝑥 1 , 𝑥 2 , 𝑥 3 ) , 𝑥 1 、 𝑥 2 、 𝑥 3 are three target values (assuming that the bigger the better), then 𝑥 dominant solution𝑦can be defined as the following formula (19): 𝑥 ≻ 𝑦 ⇔ ∀𝑥 𝑖 ≥ 𝑦 𝑖 , ∃𝑖{1,2,3}, 𝑥 𝑖 > 𝑦 𝑖 (19) In Formula ( 19), the non-dominant solution is defined as that any other individual does not dominate an individual, that is, for other management personnel training target individuals, the result of one goal of the management personnel training target individual is always better than other individuals (excluding duplicate individuals).…”
Section: Optimization Of Personnel Training Model Based On Multi-obje...mentioning
confidence: 99%
“…Based on the records maintained by the GIPC, a list of 134 ICJV projects, was identified, as of December 2021. It is important to mention that participants usually have hazy memories of past events, thus, it was reasonable to collect data from ICJVs dissolved for not more than a decade or still active (e.g., Ali et al 2021;Tetteh et al 2022). Considering the nature of ICJV -"complete and disperse" -limiting direct access or connection to respondents, alongside the habitually low response rate in the construction industry, all the 134 ICJV projects were targeted for the survey (Zhang and Qian, 2017).…”
Section: Sample and Data Collectionmentioning
confidence: 99%