2019
DOI: 10.1556/606.2019.14.1.3
|View full text |Cite
|
Sign up to set email alerts
|

Making engineering projects more thoughtful with the use of fuzzy value-based project planning

Abstract: Generally, engineering projects are getting bigger and bigger and more complex to handle. Due to the developments of information technology, managers have the opportunity to plan the execution of their projects and calculate the critical paths of those projects precisely, regardless of the types and sizes of their projects. However, these indicators are not realistic; in many cases the predetermined partial-deadlines cannot be kept, therefore the end of the project must be postponed. The aim of the research is… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
8
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 10 publications
(13 reference statements)
0
8
0
Order By: Relevance
“…6). The rating scores for mean scores are significantly affected by the following weighted points: E5-Data collection for reports; E6 -Data evaluation; E3 -Difficulty of programming; E8 -Sensor compatibility; E4 -User friendliness [11], [12], [13], [14], [15], [16].…”
Section: Fig 5 Steps Of the Methods Usedmentioning
confidence: 99%
“…6). The rating scores for mean scores are significantly affected by the following weighted points: E5-Data collection for reports; E6 -Data evaluation; E3 -Difficulty of programming; E8 -Sensor compatibility; E4 -User friendliness [11], [12], [13], [14], [15], [16].…”
Section: Fig 5 Steps Of the Methods Usedmentioning
confidence: 99%
“…Considering the uncertainties modeled by fuzzy description, the possibility theory provides the theoretical basis for defining relevant metrics based on the concepts of belief and plausibility [7]. For an application of fuzzy description in scheduling, the reader can refer to [24] or [17].…”
Section: Schedule Robustness As Performance Indicatormentioning
confidence: 99%
“…The bounded form is typically relevant when this information is not enough in order to develop an accurate description of the probability distribution, but only error bounds can be obtained [16]. The fuzzy description [17] is relevant when historical data are not readily available. Regarding the Industry 4.0 context, it is reasonable to consider that data coming back from the shopfloor can be used to build sufficiently rich information on the uncertainties.…”
mentioning
confidence: 99%
“…Enterprise resource planning-system is one of the instruments to implement disruptive ideas in business and create long-time competitive advantages [8]. Fuzzy based production planning became more accurate and more realistic than the result of a traditional network model due to the factors of unpredictability of the human workforce and those of unforeseeable interruptions in the production [9].…”
Section: State Of the Art In The Field Of Productivity Measurementmentioning
confidence: 99%