2013 IEEE International Geoscience and Remote Sensing Symposium - IGARSS 2013
DOI: 10.1109/igarss.2013.6721290
|View full text |Cite
|
Sign up to set email alerts
|

<sup>3</sup>Cat-2: A P(Y) and C/A GNSS-R experimental nano-satellite mission

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
12
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 16 publications
(12 citation statements)
references
References 1 publication
0
12
0
Order By: Relevance
“…Two other spaceborne GNSS‐R experiments are being prepared: the 3Cat‐2 [ Carreño‐Luengo et al ., ] and GEROS‐ISS. The 3Cat‐2 is a six‐unit cubesat developed by the Universitat Politécnica de Catalunya (UPC) and partially funded by the European grant FP7 E‐GEM.…”
Section: Future Gnss‐r Satellite Capabilitiesmentioning
confidence: 99%
“…Two other spaceborne GNSS‐R experiments are being prepared: the 3Cat‐2 [ Carreño‐Luengo et al ., ] and GEROS‐ISS. The 3Cat‐2 is a six‐unit cubesat developed by the Universitat Politécnica de Catalunya (UPC) and partially funded by the European grant FP7 E‐GEM.…”
Section: Future Gnss‐r Satellite Capabilitiesmentioning
confidence: 99%
“…The utmost sensors used for oceanography (SARs and radar altimeters) have features that make them difficult to board on nano-satellites, most notably the power requirements, and the antenna size. An attractive option to explore the sea surface topography is the use of reflected Global Navigation Satellite Systems (GNSS) signals [34,35]. GNSS reflectometry is a favourable technique to perform some ocean measurements with small satellites [36].…”
Section: Signals Of Opportunity (Soop): Gnss-r and Receiver Of Soopmentioning
confidence: 99%
“…After a careful study, it was found that configurations (e) (using a passive magnetic Attitude Determination and Control System ADCS) and (f) (Earth Centred Inertial ECI velocity alignment with nadir or Sun constraint ADCS and Earth Centred Fixed ECF velocity alignment with nadir or radial constraint ADCS) satisfy the link and the power budget requirements, although the configuration (e) requires deployable solar panels, and downlooking payload antenna (to be designed). Due to the lower risk the final selected configuration for 3 Cat-2 platform was a 6U CubeSat [22], (f) in Fig. 1 without any deployables.…”
Section: B Platform Selectionmentioning
confidence: 99%