“…Table 3 presents the driving factors in the production and logistics stage. At the project management level, the pull production and logistics process is realized according to the actual needs of the construction site through real-time data collection by the IoT; the CPCS automatically issues scheduling instructions to ensure that materials and components are supplied to the construction site at the required time and in the required quantity, thus realizing the JIT production mode (Ezzahra et al, 2018). At the enterprise operation level, the production logistics data are integrated with the enterprise financial management data, and the financial process is automatically triggered through business events to perform automatic collection and accounting of project costs (You and Wu, 2019).…”