2018
DOI: 10.1061/(asce)ps.1949-1204.0000322
|View full text |Cite
|
Sign up to set email alerts
|

Lifecycle Cost Study of Underground Freight Transportation Systems in Texas

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…The costs used in this regression model are based on the contract costs of the existing tunnels. Costs of several tunneling activities, such as handling the spoils from tunnel excavation and construction of access shafts, are incorporated in the tunneling contract costs (Janbaz et al , 2018).…”
Section: Life-cycle Cost Estimation Of the Airport Uft Systemmentioning
confidence: 99%
“…The costs used in this regression model are based on the contract costs of the existing tunnels. Costs of several tunneling activities, such as handling the spoils from tunnel excavation and construction of access shafts, are incorporated in the tunneling contract costs (Janbaz et al , 2018).…”
Section: Life-cycle Cost Estimation Of the Airport Uft Systemmentioning
confidence: 99%
“…Te research of tunnel asset cost involves three key aspects, including TMC prediction [2,3,32], the maintenance costs model based on life-cycle cost [33][34][35][36][37], and the maintenance cost model developed in the tunnel maintenance management system [5,33,[38][39][40]. Compared to the methods suggested in the literature, many of the case study applications estimated the costs using cost estimation methods based on expert opinion rather than statistical methods [37,41].…”
Section: Introductionmentioning
confidence: 99%