All Days 2005
DOI: 10.2118/97034-ms
|View full text |Cite
|
Sign up to set email alerts
|

Life-Cycle Profile Control in Subhydrostatic Wells of South Oman

Abstract: Profile modification of injection and production wells is of major importance in South Oman heavy oil reservoirs. This is because injected and produced water must be controlled to optimize reservoir sweep and oil production. Profile control in artificial lift wells is also a common dilemma because the intervention involves re-completing wells to achieve logging-while-pumping necessary for detecting unwanted intervals. In 2004, two completion philosophies were adopted to allo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2006
2006
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…If a completion is run with 4 ½" liner and EZIP packers with perforated or blank pipe over the inflow segments ( Figure 6), then any future inflow profile modification will require a work over of the well with a hoist or coiled tubing unit to either pump chemicals or to install packers or patches [8].…”
Section: Selection Of Re-completion Typementioning
confidence: 99%
“…If a completion is run with 4 ½" liner and EZIP packers with perforated or blank pipe over the inflow segments ( Figure 6), then any future inflow profile modification will require a work over of the well with a hoist or coiled tubing unit to either pump chemicals or to install packers or patches [8].…”
Section: Selection Of Re-completion Typementioning
confidence: 99%