IET Conference Publications 2009
DOI: 10.1049/cp.2009.0550
|View full text |Cite
|
Sign up to set email alerts
|

Life cycle cost analysis of transmission and distribution systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2010
2010
2015
2015

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 15 publications
(9 citation statements)
references
References 0 publications
0
8
0
Order By: Relevance
“…According to the study of Jeromin et al, LCC analysis includes there main stages as investment, operating and recycling. In addition to that the information, for every stage which costs are calculated, is also included in detail (Jeromin et al, 2009). Some parameters used in LCCA have been explained below.…”
Section: Stages Of Lccamentioning
confidence: 99%
“…According to the study of Jeromin et al, LCC analysis includes there main stages as investment, operating and recycling. In addition to that the information, for every stage which costs are calculated, is also included in detail (Jeromin et al, 2009). Some parameters used in LCCA have been explained below.…”
Section: Stages Of Lccamentioning
confidence: 99%
“…The Life Cycle-Cost (LCC) method has been used for quite a long time. The concept of Life-Cycle-Cost means to take into not only the installation cost, but also the operational and disposal costs into account [5 ]. This paper considers the LCC of T-5 fluorescent lamps with electronic ballast, T-8 fluorescent lamps with standard ballast, T-8 fluorescent lamps with low loss ballast, and T -8 fluorescent lamps with electronic ballast.…”
Section: Methodsmentioning
confidence: 99%
“…The factors significantly influencing the design, construction and operation of these lines are right of way (RoW), weather conditions, conductor material and configuration, insulator design, tower geometry and designs, foundations and environmental considerations [4]. LCC method provides various costs occurring in different phases of the project and helps in quantitative assessment of the costs effectively over a range of available technical solutions [5].…”
Section: Projectmentioning
confidence: 99%