2015
DOI: 10.1016/j.wasman.2015.07.011
|View full text |Cite
|
Sign up to set email alerts
|

Life cycle assessment of construction and demolition waste management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

2
78
0
4

Year Published

2016
2016
2024
2024

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 184 publications
(96 citation statements)
references
References 54 publications
(63 reference statements)
2
78
0
4
Order By: Relevance
“…Several summary reports, guidelines, and reviews related to C&D waste management, best practices, and LCAs have been published [116][117][118][119][120][121][122][123]. Approximately 1 billion tons of C&D waste, one-third of the total waste generation, was annually generated in the EU as of 2006 [116].…”
Section: Construction and Demolition Wastementioning
confidence: 99%
See 1 more Smart Citation
“…Several summary reports, guidelines, and reviews related to C&D waste management, best practices, and LCAs have been published [116][117][118][119][120][121][122][123]. Approximately 1 billion tons of C&D waste, one-third of the total waste generation, was annually generated in the EU as of 2006 [116].…”
Section: Construction and Demolition Wastementioning
confidence: 99%
“…Due to its longer lifespan, life-cycle thinking, including the design stage, is highly relevant [125,126]. Source segregation is important for promoting recycling and the reduction of environmental impacts [120,122]. However, when C&D materials are recycled, potential contamination with hazardous compounds may be involved.…”
Section: Construction and Demolition Wastementioning
confidence: 99%
“…et al, 2017), as well as the environmental impacts of various types of collection, transportation and end of life scenarios (landfill, recycling, reuse), based on Life Cycle Assessments (LCA) (Butera S. et al, 2015;Silva A. et al, 2017).…”
Section: Introductionmentioning
confidence: 99%
“…There is a lot of works of foreign authors, which devoted to scientific researches of the life cycles [1][2][3][4][5], many of them are directly related to energy efficiency and resource saving [6][7][8][9]. In the scientific and technical literature distinguish the following periods of a building's life cycle [10]: the 1-st period is the process of developing a feasibility study for construction of the building; the 2-d period is the process of developing of construction and design decisions; the 3-d period is process of building, together with the development of technology, organization and technological regulations of work; the 4-th period is the process of pre-service development; the 5-th period is directly operation of buildings and work aimed at ensuring payback of funds invested in their creation; the 6-th period is processes of manufacture scheduled preventive and major repairs to maintain in a good technical condition of constructive elements and engineering systems of the building; the 7-th period is the stage, both physical and moral deterioration of the building, when necessary to carry out works on modernization, reconstruction or demolition; the 8-th period is reconstruction, restoring physical, mechanical and operational characteristics of the buildings.…”
mentioning
confidence: 99%